Building commissioning (Cx) is an integrated, systematic process to ensure, through documented verification, that all building systems perform interactively according to the "Design Intent". The commissioning process establishes and documents the "Owner's Project Requirements (OPR)" criteria for system function, performance expectations, maintainability; verify and document compliance with these criteria throughout all phases of the project (design, manufacturing, installation, construction, startup, testing, and operations). Commissioning procedures require a collaborative team effort and 'should' begin during the pre-design or planning phase of the project, continue through the design and construction phases, initial occupancy phase, training of operations and maintenance (O&M) staff, and into occupancy (for warranty and future re-commissioning).
Historically, “commissioning” as referenced in building design and construction, referred to the process by which the heating, ventilation, and air conditioning (HVAC) systems of a building were tested and balanced according to established standards prior to the Owner's acceptance. HVAC commissioning, historically, didn't include other, interactive, supporting, or supplemental building systems that did not directly affect the performance of the HVAC systems.
Through energy and water conservation, occupant comfort, life-safety, systems criticality, and technology improvements of building systems became more in demand, and expanded the Owner's performance and technical capability expectation. The need to improve, integrate, and commission other (and more) systems expanded the scope of Building Commissioning. In modern facilities, buildings, and systems many of the systems are integrated (directly or indirectly) in operation, affect, need for proper operation, function, control, and sequencing. This can become very complex, and provide many points of sub-optimal operation, or failure, with all the many systems requiring, or affecting, interaction of each other.
For example, power sources (utility, generation, battery/cell) control and monitoring, air movement control, smoke control, fire suppression, fire alarm, security door egress/evacuation control, elevator control, space containment/infiltration, staging and sequencing of every interacting system, it's sub-system, equipment, and components each operating and interacting correctly in every operating Mode (normal, startup, shutdown, maintenance, economy, emergency, ect.).
This list can go well beyond this example, even in the most basic, typical, facility today. As more building systems are integrated, a deficiency in one component can result in sub-optimal operation and performance among other components and systems. Through system testing and "integrated systems testing" (IST) verification of all interrelationships, effects, modes of operation, and performance can be verified and documented to comply with the 'Owner's Project Requirements' and Architect/Engineers documented 'Design Intent' performance.
Thus, 'Whole Building Commissioning' (or 'Total Building Commissioning') is the accepted normal/standard, certainly for government and critical facility Owners, but also for conservation and efficiencies to provide a fully verified operational facility. Partial building commissioning (commissioning only specific equipment, functions, systems) is also still utilized, but the interrelations of many automated systems, as designed, today branch and spider throughout many other systems within even basic buildings. The Owners Project Requirements and the Architect/Engineers design should clearly identify the scope and expectations of commissioning.

View More On Wikipedia.org
  1. C

    VIC Extension to renew license

    Hi, I have applied to get builders eligibility through insurance broker and my builders license expires 13 May. Is there a way to get Victorian Building Authority give me extension under special circumstance. Thanks
  2. S

    WA FOI Refusing Information on Company Name?

    Hi, We are trying to find out the company name of a certified building surveyor who provided a certificate of design compliance for a building permit relating to an opt-in JDAP development approval on a development adjacent to us. We asked the permit authority (City of Stirling), who refused...
  3. S

    WA Easement Dispute - Who is in the Wrong?

    Hi, I am a beneficiary of an easement registered in a title (a right of way not a crown easement) that is being terminated by a development (20 units) adjacent to our property. The Council (City of Stirling) have told us that this is a `civil matter` and that we would have to take the...
  4. C

    WA Enough Evidence for a Restraining Order?

    Hello, I am thinking about applying for a misconduct restraining order and would like some help. The story: I had a builder renovate my house. The workmanship was poor and despite much discussion with the builder, nothing was resolved. I withheld the final payment and submitted a complaint to...
  5. J

    WA Australian Consumer Law Jurisdiction Issues?

    I am a self-represented litigant in an Australian Consumer Law based consumer/trader minor case claim in the Magistrates Court. Recently, I noticed the trader had committed offences under the Western Australian Home Building Contracts Act. That is in addition to breaches of section 18, 20, 21...
  6. C

    WA What to Do After Monetary Order for Building Commission?

    Hi. all I have been in dispute with a house renovator. My status is, I got the monetary order(about $15,000) from the building commission but he never paid me any. According to the fact sheet, I can drag him to the Magistrate court. or he can appeal to SAT. ( I think he will do) I wonder if I...
  7. F

    WA How to Get Builder to Pay Sum Ordered by Tribunal?

    I have taken my builder to the Building Commission due to poor workmanship and materials. The Building Commission passed the issue on to the State Administrative Tribunal and the Tribunal has ordered the builder to pay me a sum of money by a due date. The due date has passed and the builder has...
  8. S

    WA Building Contract and Dispute with Builder

    Basically, the builder we contracted to build our house has failed to complete. We have submitted a complaint to the Building Commissioner, who had accepted the complaint and passed it onto SAT. SAT had an initial hearing in March, which the builder never attended claiming they were not aware...
  9. M

    WA Unlicensed Plumber Didn't Finish Job - Refund?

    Hi everyone, I recently employed a plumber to do a bathroom/laundry renovation. She told me the plumbing would cost 8 to 9K. I paid her just over 11K (including the cost of a new hot water system she deceived me into buying), then when the job ended up not finished and full of problems, I...
  10. C

    WA Building Remedy Order - What Happens if Company Goes Insolvent?

    Hello, I have posted questions on this forum twice before, which have successfully assisted me in submitting an Official Complaint to the Building Commission. Recently, I have been issued with a 'Proposed Home Building Remedy Order' from the WA Building Commission. It is proposed until a 14 day...